loader-img

The Marble Falls Backbone Creek Bank Stabilization Project

The Marble Falls Backbone Creek Bank Stabilization Project consisted of installing limestone block retaining walls, landscaping, irrigation, and a Combi-Wall system that was installed along both sides of the bank and extends around the entire peninsula to Lake Marble Falls. The project stabilized the banks of both Johnson Park and Lakeside Park to withstand 100-year storms, flooding of the Colorado River and added roughly 2 Acres to the city’s parks system.

  • The Marble Falls Backbone Creek Bank Stabilization Project
  • Marble Falls, Texas
  • 11/01/2020
  • 12/31/2021
  • City of Marble Falls