Barton Springs Pool Bypass Tunnel & Dam Repairs
The Barton Springs Pool Bypass Tunnel is a box culvert tunnel located at the Barton Springs Pool. The bypass tunnel is approximately 6 ft high by 10 ft wide (internal dimensions) by about 1000 feet long. The project consisted of repairs and rehabilitation to both the existing Barton Springs Pool Bypass Tunnel & the Downstream Dam.
Work consisted of removing and replacing a portion of the West end of the retaining wall along the North side of the pool sidewalk. The project required Coffer Dams & Dewatering System, Rebar Stitching for floor cracks and New Concrete Floor with drilled anchors. All work was performed in a zone with endangered species and critical wildlife concerns without incident
- Barton Springs Pool Bypass Tunnel & Dam Repairs
- Austin, Texas
- 10/09/2012
- 09/10/2013
- City of Austin