Rehabilitation of historic steel and wrought iron truss spans near downtown San Antonio, TX. Work included structural steel repairs, steel member replacement, hot riveting, timber deck replacement, bearing replacement, demolition & reconstruction of concrete approach spans, utility replacement, storm drainage, roadway reconstruction, bridge lighting, and landscaping.
|
|
| |
Construction of concrete and steel bridge over Town Lake, including new drainage systems, new trail amenities, landscaping and irrigation, and colored concrete deck topping. Bridge constructed from barges.
|
|
| |
Rehabilitation of historic 565' bridge with 450' truss span over the Brazos River in Waco, TX. Work consists of structural steel repairs, structural steel member replacement, removal and replacement of lightweight concrete deck, repair and replacement of bearings, blasting and painting truss structure, and roadway lighting
|
|
![]() After | |
Photos Courtesy of White Photographic
Restoration of 300' historical steel truss over the Little River near Gause, TX. New concrete substructure, steel repairs, steel blasting & painting, new wooden deck, and riprap slope protection.
|
|
| |
Complete replacement of 611’ timber trestle and steel girder span railroad bridge over the Trinity River near Dayton, TX. Project was completed with minimal interruption to continuous train traffic. Work included access road construction, temporary work bridge, 8’ and 4’ diameter drilled shaft foundations, cast-in-place concrete substructure, three 180 TN steel girder spans, precast concrete box girder spans, and removal of existing structure.
|
|
|
|
Bridge construction, T−wall & retaining wall construction.
|
|
| |
Replace three overhead truss bridge spans with structural steel ballast deck spans across the St. Francis River in Forrest City, Arkansas. All work performed from temporary H−pile work bridge.
|
|
| |
Design−build project. Design & Construction of 15,300 square foot multipurpose chapel building.
|
|
| |
Site work & grading, concrete site work, building foundation.
|
|
| |
15,000 SF addition and renovation to existing library including site utilities and detention pond.
|
|
| |
Site grading, detention pond, water services, building slabs.
|
|
| |
Addition to existing warehouse facility with pre-engineered metal structure.
|
Construction of roller compacted concrete detention facility with box culvert structure at flow line.
|
Work included replacement of concrete apron on downstream side of 120' concrete dam within the channel of the Leon River, replacement of abutment slabs, water piping from behind dam, and pumping water from downstream side to divert river flow.
|
|
| |
Placement of new 9" concrete armor on the downstream face, crest and spillway of an approximately 500' long by 30' tall earthen dam. Includes flagstone pavers along the crest and cobbled rock finish on the spillway.
|
|
| |
Replacement of water & wastewater services and lines. Boring and tunneling. Installation of manholes and storm scepters. Pavement repair including sidewalks, driveways, curb and gutter. Erosion and traffic controls.
|
|
|
Turnkey civil package for 20 acre fuel storage and distribution terminal near Austin, TX. Project was completed under stringent safety and environmental requirements. Work included site prep, mass grading, concrete ring beam foundations for fuel storage tanks, geoclay containment liner system, concrete pipe rack foundations, building , equipment, & containment area foundations, underground utilities, roadway construction, flatwork concrete, SWPPP installation & maintenance, and site rehabilitation.
|
|
|
|
Expansion of existing pumping station. Install 4 new 24" pumps and electrical controls. Install 800 LF of 30" discharge and 400 LF of 42" suction lines.
|
|
| |
Construction of an electrical power substation including conduit duct banks, manholes, drainage system, site grading, site work, asphalt and concrete paving, new equipment and pole foundations, structure erection, control house with finishes, and 17' tall pre−cast concrete sound/security wall.
|
|
| |
Installation of conduit duct banks, fencing, guard shack islands with guard shacks, new doors and hardware, and electrical system upgrades for security improvements at four East Austin area wastewater treatment facilities.
|
|
New Taxiway Constructions, grading, storm water drainage, paving and retaining walls.
|
|